We will be performing network upgrades and maintenance to the internal network in the Brisbane Data Centre on Wednesday 25th March between 7pm and 9pm AEST (Brisbane time)
During this timeframe we will be installing additional redundancy to the internal network and performing maintenance on the routers and switches within our racks.
Users may experience brief network interruptions during this time frame however we will aim to keep interruptions minimised as much as possible.
If anyone has any queries or concerns please let us know
During this timeframe we will be installing additional redundancy to the internal network and performing maintenance on the routers and switches within our racks.
Users may experience brief network interruptions during this time frame however we will aim to keep interruptions minimised as much as possible.
If anyone has any queries or concerns please let us know